| Zakładka z wyszukiwarką danych komponentów |
|
106963 Arkusz danych(PDF) 12 Page - PHOENIX CONTACT |
|
|
|||||||||||||||||||||||||||||
106963 Arkusz danych(HTML) 12 Page - PHOENIX CONTACT |
|
12 / 25 page ![]() TRIO-PS-2G/1AC/12DC/5/C2LPS 106963_en_00 PHOENIX CONTACT 12 / 25 6 High-voltage test (HIPOT) This protection class II power supply is subject to the Low Voltage Directive and is factory tested. During the HIPOT test (high-voltage test), the insulation between the input circuit and output circuit is tested for the prescribed electric strength values, for example. The test voltage in the high- voltage range is applied at the input and output terminal blocks of the power supply. The operating voltage used in normal operation is a lot lower than the test voltage used. 6.1 High-voltage dielectric test (dielectric strength test) and why must it be performed? In order to protect the user, power supplies (as electric components with a direct connection to potentially hazardous voltages) are subject to more stringent safety requirements. For this reason, permanent safe electrical isolation between the hazardous input voltage and the touch-proof output voltage as safety extra-low voltage (SELV) must always be ensured. In order to ensure permanent safe isolation of the AC input circuit and DC output circuit, high-voltage testing is performed as part of the safety approval process (type test) and manufacturing (routine test). 6.2 High-voltage dielectric test during the manufacturing process During the manufacturing process for the power supply, a high-voltage test is performed as part of the dielectric test in accordance with the specifications of IEC/UL/EN 60950-1. The high-voltage test is performed with a test voltage of at least 1.5 kV AC / 2.2 kV DC or higher. Routine manufacturing tests are inspected regularly by a certification body. 6.3 High-voltage dielectric test performed by the customer Apart from routine and type tests to guarantee electrical safety, the end user does not have to perform another high- voltage test on the power supply as an individual component. According to EN 60204-1 (Safety of machinery - Electrical equipment of machines) the power supply can be disconnected during the high-voltage test and only installed once the high-voltage test has been completed. 6.4 Performing high-voltage testing If high-voltage testing of the control cabinet or the power supply as a stand-alone component is planned during final inspection and testing, the following features must be observed. – The power supply wiring must be implemented as shown in the wiring diagram. – The maximum permissible test voltages must not be exceeded. Avoid unnecessary loading or damage to the power supply due to excessive test voltages. Figure 1 Potential-related wiring for the high-voltage test Key The test voltage should rise and fall in ramp form. The relevant rise and fall time of the ramp should be at least seconds. For the relevant applicable test voltages and insulation distances, refer to the corresponding table (see technical data: electric strength of the insulation section). No. Designation Color coding Potential levels 1 AC input circuit Red Potential 1 2 High-voltage tester -- -- 3 Signal contacts Green (optional) Potential 2 4 DC output circuit Blue Potential 2 + + - - - L/+ N/- DC OK 13 14 1 2 3 4 HV /= |
|
|
Link URL |
| Czy Alldatasheet okazała się pomocna? [ DONATE ] |
O Alldatasheet | Reklama | Kontakt | Polityka prywatności | Link do karty katalogowej | Linki | Lista producentów All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |